TTG PROJECT

Location: Thailand

Total area: 5000 m2

Scope of work: Design-Fabrication-Erection- Supervision 

Duration: 3 months

TTG project had been completed by applying Pre-Engineered Structure. The construction area was saved spaced optimally and less expenses in workforce because steel had been fabricated in factory before. Moreover, the construction time was shorten as twice.

US Buildings always ensure the safety and high-quality progress for your construction. We are proud of being the best choice for steel buildings.