ADVANTAGES

03/04/2017

 

REDUCE CONSTRUCTION TIME:
 

Due to the systems approach, the use of high strength steel, use built-up sections which optimized by the computerized design program and the use of continuous light WEIGHT secondary steel section, there is an overall reduction in steel weight, cost and time relative to conventional steel construction.

 



DESIGN: 

 


 

Since PRE-ENGINEERED BUILDINGS (PEB'S) are mainly formed of standard sections and connections, the design time is significantly reduced. Specialized computer analysis and design programs optimize material require. Drafting also computerized using standard details that minimizes project custom details. The low-weight flexible frames offer higher resistance to seismic forces.
 

 


FOUNDATION:

 


Pre-engineered Buildings are about 50% lighter than the conventional steel structures. Hence, the foundations are of simple design, easy to construct and lighter
 

 


ERECTION:

 


 

ALL components are standard LIKE THE LEGO.the erection time is faster.
 

 


FLEXIBILITY OF EXPANSION:


Buildings can be easily expanded in length by adding additional bays. Also, expansion in width and height is possible by pre-designing for future expansion.

 

 


LARGE CLEAR SPANS:
 


Buildings can be supplied to around 90M clear spans.

Energy Efficient Roof and Wall Systems:

Buildings can be supplied with polyurethane insulated panels or fibERglass blanket insulation to achieve required ‘U’ values.
 

 


LOWER COST:

 



Due to the systems approach, there is a significant saving in design, manufacturing and site erection cost. The structural elements are shaped to follow the stress diagram of the member, thus reducing weight, cost and load to foundations. The secondary members and cladding nest together reducing transportation cost. The overall price per square meter may be reduced as much as 30% lower than conventional steel.